Services

Organized by project code.

The code on this page is the same code that appears on your estimate, your schedule, and every photo album from your job. One system from first call to final walkthrough.

Insured — certificate of insurance available on request.


Project 07

Interior Painting

Turnover-ready interiors on a stated schedule.

Walls, ceilings, trim, doors, and railings — prepped, masked, and finished for occupancy. Products are specified in writing and recorded by room, so the exact color and sheen can be matched years later. Interior work is scheduled around guest calendars and turnover windows, and the schedule is stated in days before work begins.

Request an estimate for Project 07 →

Project 08

Exterior Painting & Staining

Finishes specified for East Tennessee weather.

Cedar, log, and siding finishes built as systems: surface preparation, product, and application documented for every elevation. Stain and paint records are kept by product and batch, so maintenance cycles reuse the exact specification instead of guessing. You receive the product record with the final photos.

Request an estimate for Project 08 →

Project 04

Full Renovation

One written scope. One schedule. One point of contact.

Interior renovations from a written scope — flooring, trim packages, kitchens, baths, and finish carpentry — coordinated under one schedule with daily photo documentation. Scope changes are priced and approved in writing before they happen, not discovered on the invoice.

Request an estimate for Project 04 →

Project 10

STR Conversion

The listing goes live on a stated date.

A property made rental-ready: scope built around listing photos, guest wear points, and the booking calendar. Work is sequenced so photography, punch list, and handover land on the date the listing needs to go live — and the daily CompanyCam record shows an out-of-state owner exactly where things stand.

Request an estimate for Project 10 →

Project 12

Deck Build + Stain

Built, finished, and documented as one project.

Decks, railings, and stairs — new builds, rebuilds, and repairs — finished with stain systems documented by product and batch. Structural work and finish work run under a single project code, so the record covers the deck from framing to final coat.

Request an estimate for Project 12 →

Project 17

Cabinet Refinishing

A furniture-grade finish without replacement cost.

Cabinet doors, drawer fronts, frames, and built-ins refinished in place with a documented product system. Photographed before, during, and after — the finish specification stays on file for touch-ups and future rooms.

Request an estimate for Project 17 →

Project 20

Maintenance Contract

One agreement. Photographed visits. Priority scheduling.

Scheduled maintenance for rental properties: seasonal exterior care, interior touch-up cycles, and small repairs handled before they become guest reviews. Contract clients receive priority scheduling and a photographed record of every visit, organized by property.

Request an estimate for Project 20 →

Not sure which project code fits?

Describe the property and the work. We’ll classify it, walk the site, and put the scope in writing.

Request an Estimate